Decision table
If you have not chosen between an enclosed chamber and a head-out cryosauna, start with the whole-body chamber guide.
| Buying consideration | Electric system | Nitrogen system |
|---|---|---|
| Recurring cooling input | Electricity | Liquid nitrogen plus electricity |
| User position | Enclosed/head-in and head-out electric designs exist | Open-top/head-out and enclosed nitrogen designs exist |
| Site focus | Power, refrigeration layout, heat rejection | Supply access, storage, ventilation, monitoring and exhaust |
| Cost sensitivity | Utility demand, maintenance and refrigeration service | Delivered gas price, evaporation, tank rental and delivery schedule |
| Session capacity | Model-specific | Model-specific |
| Main failure in comparisons | Ignoring contractor and service cost | Using gas price without delivery, rental or losses |
Once the site comparison leaves a cooling option open, check the machines themselves: the electric chamber guide covers power and refrigeration layouts; the nitrogen cryosauna guide covers formats, tank choices and supply readiness. Confirm site fit before choosing by running cost.
Where each technology fits
Electric equipment needs a site that can meet its published power, mechanical equipment and heat-rejection requirements. For nitrogen, confirm that local delivery, storage and room arrangements can meet the proposed model's requirements.
Have the supplier and the relevant local contractor check the same layout before ruling out a cooling option. An unanswered question calls for a document or site assessment.
Check six site constraints before choosing
| Site constraint | Document to collect | What it can tell you | Next step |
|---|---|---|---|
| Electrical service | Current model requirements: voltage, phase, frequency and circuit details; an assessment of the available site service | Which configurations can use the service and which would need an upgrade. Nitrogen equipment can also need electricity | Ask the supplier and qualified local electrician to review the same configuration and drawing |
| Refrigeration placement and heat | Mechanical layout, component clearance, heat-rejection requirements and any wall or roof penetrations | Whether the proposed mechanical equipment fits; electric systems use different layouts | Review the layout with the supplier, landlord and relevant contractor before accepting a proposal |
| Gas delivery and storage | Local supply proposal, proposed vessel details and model-specific room requirements | Whether a nitrogen configuration has a workable supply and storage arrangement. An electric candidate can remain open while this is checked | Name who supplies, installs, maintains and approves each part of the proposed arrangement |
| Staffed hours and workload | A documented operating cycle covering preparation, exposure, cleaning and recovery; operator requirements and downtime assumptions | Whether either candidate can deliver the proposed work during your staffed hours | Use the same paid and unpaid workload in the comparison below; check cycle time and staffing separately |
| Space and delivery access | Full operating layout, service clearances, weights and a delivery-route survey | Whether a specific configuration can be delivered, installed and serviced. A machine footprint alone can't answer this | List work still to be priced in the installation responsibility matrix |
| Local service | Written coverage for the proposed location, technician arrangements, parts support, response terms and exclusions | Available support, response times and costs | Request the missing terms and price the disruption case separately from normal operation |
These are screening questions, not installation specifications. The Artica Vortex product page and CRYONiQ room-requirements guide show why you need documents for the exact configuration. Confirm local approval separately.
Use the installation responsibility checklist to agree who provides the documents and completes the work, including what must be ready before the next step can start.
- Choose the format
- Check each site constraint
- Price the unresolved work
Estimate electricity from published figures
Use a rating-based illustration before you have measurements. The Artica examples assume 2 cooling hours and 6 holding hours. Everest uses its supplier's calculator day, whose operating hours are not specified.
The worked examples below are available without JavaScript.
| Equipment | Published input and chosen hours | Illustrative energy | Benchmark cost | Source |
|---|---|---|---|---|
| Artica Element | 8.2 kW x 2 h + 4.1 kW x 6 h | 41 kWh | $5.96 | Manufacturer mode ratings, checked October 15, 2026 |
| Artica Vortex | 8.2 kW x 2 h + 4.1 kW x 6 h | 41 kWh | $5.96 | Manufacturer mode ratings, checked October 15, 2026 |
| CryoBuilt Everest | 90 kWh calculator day | 90 kWh | $13.08 | Supplier calculator, checked October 15, 2026 |
Electricity benchmark: EIA US commercial average for July 2026, released September 24, 2026, checked October 15, 2026. It measures historical average revenue per kWh, not your energy-only tariff. Do not add separate demand fees to this benchmark to reconstruct a local bill.
Rated power and calculator assumptions are not measured use. Additional cooling, overnight and closed-day loads may be missing. These buttons show a separate estimate; they do not fill or replace your measured worksheet inputs.
Cooling source and user geometry are separate choices
"Electric" and "nitrogen" describe how the cold is made. Whether the user's head is inside or outside the cold zone is a different question, and every combination exists:
- The CRYO Science lineup includes the nitrogen-cooled, enclosed Arctic alongside its electric systems, so an enclosed chamber is not automatically electric.
- The Vacuactivus Antarctica Electric page, checked October 6, 2026, describes electric cooling with the user's head outside the cold zone.
This matters for costs and operations. Gas consumption from a head-out cryosauna can't be transferred to a gas-cooled heat-exchange chamber. For each candidate, check the cooled body region, breathing environment, capacity, operator requirements and current instructions. Cooling technology alone doesn't tell you staffing, intended use or safety controls.
Set up a fair comparison
Pick one electric and one nitrogen model that can serve the same customer volume and service format. Then hold everything else equal: analysis period, operating days, completed sessions, finance treatment, labor rate and downtime.
Use one workload for both. For example, 10 completed sessions a day over 25 operating days gives 250 sessions a month for each candidate. Dividing one system's daily cost by 20 sessions and the other's by 10 manufactures a technology "advantage" that is really a volume difference.
Draw the same cost boundary. Electric energy should cover the documented system: chamber, mechanical unit, pull-down, runtime, standby and any share of room cooling. Nitrogen should cover model-specific use per session, separate precooling and losses, tank rental, minimum purchases and delivery terms. Note which costs continue in a month with no sessions; at zero sessions, cost per session is undefined.
Count cash once. For a cash purchase, count acquisition and site preparation once, then operating costs. For a financed purchase, count the actual upfront cash, fees, installments and any final payment - not the full purchase price as well. Don't add a bundled item a second time.
Use figures you can verify. Use capacity and temperature claims only when the maker states the measurement method. Base demand on your location, not the maker's revenue examples.
Stress both. Run a lower-demand case and a disruption case: a refrigeration outage for electric, a missed delivery for nitrogen.
Price local supply with the nitrogen inputs and the installed project with the common ownership worksheet.
Compare the same documented operating period
Read each electricity figure in its own units
Power in W or kW and energy in kWh answer different questions. These figures describe different operating states. A daily energy estimate also needs the operating schedule.
| Model | Published figure and source | How to read it |
|---|---|---|
| CryoBuilt Everest |
| Calculator input, not measured daily use. The operating schedule and whole-system boundary still need confirmation. |
| Artica Element |
| Mode power ratings. An energy estimate also needs time in each mode and any additional loads. |
| Artica Vortex |
| Mode power ratings. An energy estimate also needs time in each mode and any additional loads. |
| CRYONiQ CRYO XC |
| Session figures conflict. Confirm the applicable rating for the offered electrical configuration. Neither label is measured energy. |
| CRYONiQ CRYO XC Plus |
| Session figures conflict. Confirm the applicable rating for the offered electrical configuration. Neither label is measured energy. |
| Zimmer MedizinSystems Cryo 6 |
| Maximum therapy-power label. Not an all-mode maximum, energy per appointment or a circuit requirement. |
| Zimmer MedizinSystems Cryo 7 |
| Maximum input-power label, not measured energy per appointment or a circuit requirement. |
For an operating budget, obtain measurements over a documented schedule and a consistent system boundary. For standby energy, ask for a correctly labeled power value.
First define one delivered cycle for both configurations. Then enter the same operating days, closed days, paid and unpaid workload, currency and tariff. Operating plus closed days must cover the whole calendar period you select.
Keep people and cycles distinct. The same number of cycles can involve different numbers of users and different staffing needs. Check capacity and operating requirements for each model separately.
Include full-day or overnight energy and closed-day liquid losses. Enter zero only when the measurement or supply terms support it. Whole-day electricity already includes the measured workload inside its system boundary, so don't add a separate cycle measurement on top of it.
Minimum circuit ampacity and connected load help plan the installation; neither is a measured kWh figure. Ask for measured energy use for a named configuration and period, with the equipment included in the measurement listed. Nitrogen use likewise needs a defined cycle, with precooling, storage and other losses listed separately.
The nitrogen system has its own electricity line in addition to purchased liquid and period fees. Add only costs that are priced separately. For labor, space, service, capital and other costs, say what the total includes and what is still missing. Name the line that covers any bundled cost so you count it once.
Label a multi-year total by what it includes
A five-year view needs delivered equipment cost, site work, finance outflow, completed sessions, local tariff, delivered nitrogen cost, tank fees, scheduled service, repair reserve, labor, downtime and end-of-term value, run at low, base and high utilization. The worksheet above covers one operating period. Replacement, price changes, the financing schedule and end value belong in the business-plan cash worksheet.
Name any total for what it covers. Electricity or gas plus planned maintenance and training can be correct arithmetic and still leave out rent, staff, marketing, finance and downtime. Keep an exclusions column next to it.
Also be careful with ranges. Two category-level low/high figures don't give you a ratio for your site. Compare at the same sessions, days, tariff basis and system boundary, and change those inputs openly in the downside case.
Questions before selection
- Which site work is included in each delivered proposal?
- What local service or gas coverage is available in writing?
- How many completed sessions are realistic during the buyer's staffed hours?
- Which costs continue during a low-volume month?
- What event would stop operation and how quickly can it be resolved?
- What contract obligations remain if the location closes or the equipment is replaced?
Make your choice
Keep each figure with its source and check date, and distinguish a written quote from an estimate. Choose the technology that fits the site and your cost scenarios. Write down why you rejected the other option so you can revisit the decision if a price or site condition changes.
If only one configuration fits the site and has local support, price its complete installation before comparing it with a cheaper alternative that still needs confirmation. If both fit, use the matched operating-period worksheet and compare the same costs. Wait for any deciding document or cost, and agree who will supply it.
Check the purchase and setup comparison before committing funds. Lower utility bills may come with higher installation costs.
For a monthly business budget, check how utility totals and delivered workload fit the ROI model. The worksheets use different periods and input definitions; amounts do not transfer automatically.
Assign the work around self-service
A self-service feature does not answer who prepares the room, responds to a problem or maintains the equipment. Before reducing a staffing allowance, obtain the applicable instructions for the offered mode and assign the work they require. Keep a supplier's automation claim separate from your approved operating plan.
| Responsibility to clarify | Written answer needed |
|---|---|
| Opening and equipment preparation | Applicable tasks, responsible role and confirmation of readiness |
| User access and instructions | Who provides the required preparation and assistance |
| Supervision and interruption | What the specific mode requires and who responds |
| Cleaning and changeover | Assigned work, supplies and actual turnaround |
| Planned care and diagnostics | Operator tasks versus qualified service-provider work |
| Loss of power, network or remote support | Applicable instructions and the responsible escalation route |
| Closing and next-day readiness | Named role and questions still to answer |
Use the demonstration checklist to time staff work alongside equipment runtime. Keep completed, test, unpaid and interrupted activity separate. For recurring care, use the maintenance notes; an advertised exposure duration alone cannot price the full workday.
Estimate electricity mode by mode
Running costs / Your measurements
Estimate electricity use mode by mode
Enter warm-up, completed cycles, ready time and room cooling separately. Unpaid cycles count toward consumption. Leave unmeasured amounts blank to see the blocks you can already calculate. A complete set of inputs gives an operating-day subtotal plus your entered period charges; closed-day loads are outside it.
Electricity formula and measurement limits
Daily kWh = warm-up kWh + (paid + unpaid completed cycles) x cycle kWh + idle hours x measured average idle kW + additional cooling kWh. Period energy = daily kWh x operating days. Entered subtotal = operating-day energy x tariff + other period electricity charges. Subtotal allocated per paid cycle = entered subtotal / (paid cycles/day x operating days); undefined at zero paid cycles.
This repeats one entered operating day across the billing period. It does not model variable schedules, overlapping loads, peak-demand timing, utility tariff tiers, taxes unless entered, non-operating days or unrecorded overnight loads. For the billing boundary and separately entered charges, read the commercial power-bill check. For a complete metered daily figure, use that figure in your own worksheet rather than adding the same energy again as component blocks. Acquisition, nitrogen, labor, rent, maintenance, revenue and profit are outside this calculator.
Calculation and CSV downloads need JavaScript. Open Electricity formula and measurement limits above for the manual calculation and its scope.
Compare your operating period
One calendar / Your documented inputs
Compare electric and nitrogen costs on the same workload
Both systems share one set of operating and closed days, paid and unpaid cycles, currency and electricity tariff. Remember that nitrogen equipment uses electricity too. Nothing is prefilled: no model costs, prices or demand.
Formula and comparison limits
Paid period cycles = paid/day x operating days. All period cycles = (paid + unpaid)/day x operating days. Electric utility cost = (operating-day kWh x operating days + closed-day kWh x closed days) x tariff + period electricity charges. Required nitrogen = ((paid + unpaid)/operating day x liters/cycle + other liters/operating day) x operating days + liters/closed day x closed days. Purchased liquid is the greater of required liquid and the stated period minimum. Nitrogen electricity includes its operating and closed days. Nitrogen utility cost = its electricity + purchased liquid x delivered price + other period charges. Selected separate costs add once; explicitly included costs do not add twice. Per-paid-cycle allocation uses all entered costs divided by paid cycles; it is undefined at zero paid cycles and is not a marginal treatment cost. This compares the costs you enter. It cannot confirm equivalent services, safe installation or delivery dates, and it does not forecast investment returns or future prices.
The interactive comparison needs JavaScript. The common-period definitions and formulas remain available for your own worksheet.
Plot cumulative purchase and running budgets
Your assumptions / monthly cash costs
When could the higher purchase price be recovered?
Enter two upfront totals and two comparable monthly cost budgets. Include the same workload and cost categories in each monthly budget, and keep purchase payments out of recurring costs so they are not counted twice.
The interactive chart needs JavaScript. At month m, cumulative cash cost = upfront amount + m x monthly cost. No inflation, discounting, resale or revenue is modeled.
Sources
- Element product page - Artica SystemsArtica Systems
- Vortex product page - Artica SystemsArtica Systems
- Cryotherapy products overview: model configurationCRYO Science
- Room requirements guideCRYONiQ
- OSHA inspection 1448201.015: liquid-nitrogen fatalityU.S. Occupational Safety and Health Administration
- Antarctica Electric FAQ: head-out use and electrical optionsVacuactivus
- Nitrogen vs Electric vs Hybrid Cryotherapy ChambersCRYONiQ
- Electric Power Monthly, Table ES1.A (July 2026 data)US Energy Information Administration