Published equipment prices
Equipment prices only
- CRYONiQ XCCash package to be quoted
- Current cash quote requiredRead the historical catalog reference
Head-out nitrogen system. Gas supply and site costs are separate.
- CRYONiQ XC PlusCash package to be quoted
- Current cash quote requiredRead the historical catalog reference
Compare the published feature marks and the same gas arrangement.
- Artica ElementMaker purchase-page reference
- USD 75,998Checked October 14, 2026
Electric main unit. Resolve freight wording and price the room work.
- Artica VortexConfigurator option prices
- USD 97,498 / USD 97,998Checked October 20, 2026
Chamber, control and outdoor units. Ask which price applies.
- Everest Essential / EliteMaker calculator inputs
- USD 115,500 / USD 135,500Checked October 14, 2026
Two package references, not accepted cash offers or installed budgets.
Monthly payment ads are not cash prices. Each figure describes only the package named next to it; none is an installed quote or a category average.
Use the whole-body equipment guide to compare formats. The price index lists published equipment prices; the table below explains their price types and the costs still to confirm.
Compare published prices and what they leave out
Scroll to see every column. With a keyboard, focus the table and use the arrow keys.
| Model | Price type | Published amount | Source and check date | What to confirm |
|---|---|---|---|---|
| Artica Element | Manufacturer listing | USD 75,998 | Element, October 14, 2026 | Conflicting shipping language; configuration, site work and tax |
| Artica Vortex | Configuration pricesConfigurator option prices | USD 97,498 for one option set and USD 97,998 for most others | Vortex, October 20, 2026 | Ask which price applies to your selected configuration; confirm contractors and destination freight |
| CryoBuilt Everest Essential / Elite | Supplier ROI-calculator references | USD 115,500 / USD 135,500 | Everest reference table, October 14, 2026 | Current cash offer, selected package and included installation |
| CRYONiQ CRYO XC / XC Plus | Current cash quotation required | Earlier catalog amounts are historical references | US catalog publication reviewed November 6, 2026 | Matched gas system, options, tax, freight, commissioning and local supply |
| MECOTEC cryo:one+ | Quote onlyIndividual quote required | Not published | US model page, October 11, 2026 | Equipment, delivered project, service and warranty package |
The CryoBuilt amounts are published calculator inputs, not accepted offers. Earlier CRYONiQ catalog amounts were starting references and now require current matched cash quotations. Neither tells you the installed cost at your address. A monthly finance teaser belongs in a separate payment schedule.
If Vortex or Everest is on your shortlist, prepare the Vortex request or Everest request to collect the model-specific documents. Bring the itemized reply back to the worksheet below.
Everest advertises a 1-year PROTECT warranty for Essential and a 2-year PROTECT warranty for Elite, checked on October 11, 2026. Ask for the actual parts, labor, travel and exclusion terms before comparing coverage.
The MECOTEC cost guide describes its category ranges as examples from another seller's listings - not a market survey and not MECOTEC prices. That's why this page lists named references with their price type instead of blending ranges into an average.
Why two similar quotes can produce different total costs
Suppliers handle freight, rigging, site survey, electrical work, wall or roof penetrations, condenser installation, ventilation, gas monitoring, calibration, commissioning, training and travel differently. Once the exclusions are priced locally, the lower equipment line can turn into the more expensive installed project.
Compare line by line before comparing totals. Check configuration, delivery address, tax basis, period and workload. A blank amount still needs pricing; enter zero only when the written scope supports it.
Keep four budgets separate: purchase and installation, running utilities, financing payments and the full business plan. A quote subtotal covers only the costs it names.
Build the budget in this order:
- Name the model, package, site and proposed opening date. Check the installation dependencies before accepting a delivery promise.
- Ask each supplier to complete the same quote checklist. Request separate contractor quotes for excluded work.
- Enter the opening costs and annual equipment costs in the comparison worksheet. Choose one currency and comparison period.
- Move the confirmed costs into your business cash schedule, where staffing, demand, financing dates and delayed opening can be assessed separately.
For configuration and site questions, use the Vortex buying guide or Everest package review. If the cooling source is still undecided, start with the electric and nitrogen comparison, then bring each option's actual installation scope into this worksheet.
Comparable quote worksheet
Send the same checklist to every supplier.
Product and price
- Exact model and configuration
- Cash equipment price
- Quote currency and validity period
- Deposit and payment milestones
- Tax treatment
- Optional equipment
Delivery and installation
- Freight to destination
- Unloading and rigging
- Delivery-path survey
- Site survey
- Electrical work included
- Condenser and penetrations included
- Ventilation or gas-safety work included
- Permits and inspections included
- Calibration and commissioning included
- Target lead time and dependencies
Training and launch
- Operator training format
- Number of people included
- Training travel included
- Documentation supplied
- Launch support included
Warranty and service
- Warranty start date
- Parts coverage
- Labor coverage
- Technician travel coverage
- Compressor or refrigeration coverage
- Wear-item exclusions
- Remote monitoring fees
- Preventive-maintenance schedule
- Response target in the buyer's location
- Service after warranty
Financing
- Financed principal
- Down payment
- Term
- Interest rate or factor
- Monthly payment
- Documentation fees
- Final buyout or residual
- Early payoff conditions
- Personal guarantee
- Ownership at the end of term
International landed-cost check
Buying from abroad, or from a US supplier for a site outside the US? Specify the destination country, delivery address, quote currency, tax treatment, customs responsibility and the delivery term with its named place. Use the delivery-responsibility check to assign insurance, unloading, storage, import paperwork, permits and commissioning travel. US free shipping and a US service network don't automatically extend to another market.
Leave duty and tax blank until the product classification and local treatment are confirmed. If VAT or a similar tax may be recoverable, show it separately rather than quietly deducting it. Convert currency only for a signed foreign-currency quote, at a dated exchange rate, and keep the original currency visible.
Ownership-cost model
Choose your expected ownership period.
| Budget line | Document or input to collect | Amount basis | Keep separate |
|---|---|---|---|
| Machine and selected options | Dated cash offer for the exact model and package | One purchase, named currency | A monthly finance payment is not a second machine price |
| Delivery, rigging and commissioning | Destination freight quote and written installation scope | One delivered project | Do not add a service already included in the package |
| Room and utility work | Supplier drawings and contractor proposals | One site, with exclusions listed | Chamber dimensions alone do not price the working room |
| Electricity and nitrogen | Documented consumption blocks, local tariff and gas contract | Same calendar period; kWh and liters retained | Include unpaid use and closed-day loads or losses when documented |
| Service and consumables | Maintenance schedule, warranty terms and consumable list | Recurring fee plus separately identified events | Warranty duration does not confirm labor, travel or parts coverage |
| Staff time | Operating plan and staffing cost inputs | Staffed hours for the named period | Do not count the same time in per-session labor and overhead |
| Service interruption | Unavailable days, repair quotes and reopening assumptions | A separate downside scenario | Lost receipts are not another supplier invoice |
| Financing | Deposit, installments, fees and final payment schedule | Dated cash movements | Keep principal repayment separate from interest and fees |
total ownership cost = equipment + delivery + site work + launch + financing cost + energy or nitrogen + labor allocation + planned service + consumables + software + insurance and compliance inputs - expected residual value
This planning framework is broader than the quote worksheet. The quote comparison covers only listed acquisition and annual equipment costs, excluding rent, staffing, demand, lost revenue and full business cash flow. Keep inputs visible, including utilization and utility assumptions behind supplier daily estimates.
One-time inputs
Collect equipment cash price; freight, unloading and rigging; electrical work; HVAC, ventilation or condenser work; gas storage and monitoring; permits and professional fees; training and launch; initial spare parts or supplies.
Monthly inputs
Include electricity or delivered nitrogen; staff time allocated to sessions and care; planned maintenance reserve; consumables; software and remote monitoring; your insurance and compliance costs.
Financing cash schedule
For ownership cost, count the cash equipment price once, then interest and fees. For cash flow, schedule the deposit, installments and final payment when due, without adding the full financed price. Avoid counting bundled installation or service twice. Neither calculation forecasts demand or profit. Leave resale blank until you have a supported estimate.
Risk inputs
Include expected downtime days, service travel, parts outside warranty, demand ramp period, and relocation or resale costs.
A worked comparison with the same cost scope
This hypothetical comparison uses USD and a three-year period. Both examples cover the same opening and annual equipment cost categories, with bundled items counted once. Replace the example amounts with your own quotes.
| Cost included | Example A | Example B |
|---|---|---|
| Machine cash price | USD 100,000 | USD 110,000 |
| Other opening costs | USD 29,000 | USD 14,400 |
| Opening total | USD 129,000 | USD 124,400 |
| Annual equipment costs | USD 9,000 | USD 14,000 |
| Opening plus three years of those equipment costs | USD 156,000 | USD 166,400 |
B costs less to open even though its machine price is higher. A has the lower three-year subtotal on these assumptions. The annual lines cover electricity/cooling, consumables, service, insurance and other equipment expenses. Add staffing, rent, finance, tax effects, lost receipts and resale separately when building the business plan.
If B's service amount is missing, ask for it before deciding which total is lower. The quote worksheet shows known subtotals while keeping missing costs visible. It is not prefilled with these examples.
Hypothetical USD cases from the table above. The blue segment includes the machine and other opening costs; the sand segment adds three years of the listed annual equipment expenses.
USD 129,000 opening + USD 27,000 equipment expenses
USD 124,400 opening + USD 42,000 equipment expenses
At opening: B is USD 4,600 lower. Its smaller non-machine allowance more than offsets its higher machine price.
Over three years: A is USD 10,400 lower. The assumed annual difference changes the comparison.
These are selected cost subtotals. Staffing, rent, finance, tax effects, lost receipts and resale are excluded. Neither bar represents business profit or investment return. The complete comparison needs every cost in scope.
Electric operating-cost input
Ask for measured or documented kWh for the complete system on a stated schedule, broken into initial pull-down, runtime, standby, room cooling and shutdown or defrost. Multiply by your local tariff and add any demand or fixed charges.
Watch the units. Amperes describe an electrical rating, kW describes power, and kWh describes energy over time. A breaker rating, an MCA figure or an ambiguous "per hour" figure can't give you a daily electricity bill. Ask for the electrical sheet, the units and the measurement conditions.
A supplier's daily-cost figure is a scenario. The Everest page, for instance, offers an illustrative calculator energy input; it isn't a measured bill for your room. When comparing chambers, use the same operating days, utilization and auxiliary loads.
Use the electricity mode worksheet to budget warm-up, paid and unpaid cycles, ready time and extra room cooling from separate, non-overlapping measurements. The download keeps the cycle definition and measurement source beside those amounts. Leave energy use blank until you can supply it; a blank is not zero consumption.
Read the commercial power bill before choosing a tariff
Duke Energy's bill explanation separates fixed customer charges, usage charges and riders. Some customers pay for demand in kW as well as energy in kWh. Riders can be fixed or usage-linked, and their details vary by location. This is a billing example from one utility, not a tariff for every US site.
Get the rate schedule that applies to your address and account. Keep its effective date, energy-price periods, demand basis, fixed charges and other adjustments with the calculation. Decide whether you are budgeting the whole premises bill or the additional cost of this equipment. A shared building charge is not automatically an added chamber cost.
Illustration only: 100 kWh at an assumed USD 0.20/kWh gives USD 20 in energy charges. Add USD 15 of separately entered period charges and the total is USD 35. Dividing that total by 100 kWh gives USD 0.35/kWh; using this blended figure and adding the same USD 15 again would count those charges twice.
The electricity worksheet accepts one energy rate and one amount for other period charges. It does not derive demand charges from the load schedule, apply tariff tiers or price multiple time-of-use periods. Calculate those outside the tool and keep the bill or tariff calculation with your scenario notes.
Nitrogen operating-cost input
Take liters per session from the exact model's documentation and price them with a current delivered quote from a local gas supplier. Cryo Innovations states 2-3 liters per session for the nitrogen XR Cryosauna, while CRYONiQ material gives different ranges for pressurized and non-pressurized configurations. Those claims can't be blended into a category average.
Required liquid (L/month) = all delivered operating sessions x L/session + separately documented precooling and losses (L/month)
Purchased liquid (L/month) = greater of required liquid or the contractual purchase minimum
Monthly nitrogen bill = purchased liters x delivered currency/L + separate tank, delivery and other period charges
Count trial, training and unpaid sessions - they use nitrogen too. Ask both the equipment supplier and the gas supplier how their figures handle precooling, transfers, storage losses and idle periods. Ask for the basis of any proposed loss allowance.
Check the arithmetic before importing a running cost
Multiply consumption by the unit price, then check which sessions and costs the supplier's total includes. Keep the units and session count beside each amount.
| Check | Worked example | How to use it |
|---|---|---|
| Liters times delivered unit price | If 5-8 L/session and USD 1-2/L are independent input ranges, the gas-only envelope is USD 5-16/session | A narrower range needs paired assumptions; rental and delivery remain separate |
| One matched activity level | 10 completed sessions/day x 25 operating days = 250 completed sessions/month | Use that same month for both technologies before calculating cost/session |
| Complete cost scope | Revenue minus electricity excludes staffing, rent, service, marketing and finance | Include those costs before calculating business profit or cash break-even |
These are arithmetic examples, not local quotes or demand forecasts. Enter your documented consumption and supplier terms in the nitrogen worksheet, then use the ROI scenarios for business cash flow. The nitrogen and electricity worksheets both carry units and the denominator into their downloads.
New versus used
A used chamber lowers the purchase line but adds inspection, deinstallation, freight, recommissioning, software transfer, refrigerant, warranty and parts risk. Before you value the discount, get the serial number, service and usage history, current fault log and the written position on warranty transfer.
Keep each price tied to its document
Before entering a quoted cost, get a written offer naming your model, configuration, options and delivery address. Keep the source, check date, currency and exclusions with the amount. Save earlier quotes and get a written explanation when figures conflict.
Decision rule
Don't buy on the lowest sticker price. Choose the offer that fits the site and operating model with the fewest costs still to price. If a supplier leaves part of the common checklist unanswered, make that gap visible in the decision.
Common price questions
What is included in a chamber price?
Only what the quote lists. Ask for separate lines for equipment, freight, placement, site work, commissioning, training, tax and first-year supplies. A "free shipping" or "installation included" badge doesn't cover contractor work that isn't named.
How much does a chamber cost each month?
Start from your schedule and a local utility or gas quote, then add tank rental where it applies, maintenance, service travel, software and other recurring equipment costs. The purchase prices above cannot tell you a monthly bill. For gas inputs, use the nitrogen cost worksheet.
Is an electric chamber always cheaper to own?
No. It depends on the installed quote, utilization, tariffs, auxiliary cooling and service. Removing nitrogen purchases changes the cost structure; it doesn't make the rest of ownership free. Compare both at the same completed-session count and period with the technology guide.
Does a warranty cover all maintenance and downtime?
Check the actual parts, labor, travel, freight, exclusions, term and any usage cap. A response target isn't a repair deadline, and a long compressor promise doesn't necessarily cover the rest of the system. The service checklist helps you pin down those limits.
Sources
- Element product page - Artica SystemsArtica Systems
- Vortex product page - Artica SystemsArtica Systems
- Ethos vs. Vortex: key differences and performance comparisonArtica Systems
- Everest product page and calculator - CryoBuiltCryoBuilt
- Cryotherapy Chamber Cost: What an Electric Chamber Really CostsMECOTEC
- CRYONiQ US product catalogCRYONiQ
- MECOTEC cryo:one+ US product page: temperatures and cabinet imagesMECOTEC
- How Is Electricity Priced? Duke Energy ExplainsDuke Energy / illumination