01

Current catalog beyond the XC family

TaigaElectric whole-body chamber
Cash quote requiredHistorical catalog cash price: $68,750; checked October 15, 2026
CRYO XC PlusNitrogen chamber
Cash quote requiredHistorical catalog cash price: $38,750; checked October 14, 2026
CRYO LCNitrogen localized device
Cash quote requiredHistorical catalog cash price: $12,750; checked October 14, 2026
RivisCO2 handheld device
Cash quote requiredHistorical catalog cash price: $10,750; checked October 15, 2026

The US catalog, reviewed November 6, 2026, advertises monthly payments and quote requests for these five models. Taiga is described as available to order, which does not confirm stock or a delivery date. Taiga Pro and Velia have future 2027 availability announcements and are excluded from the currently offered comparison set here.

The catalog does not give a complete Taiga or Rivis layout or the exact US electrical version. Ask for the current manual and configuration sheet before comparing delivered quotations or choosing a site.

For Rivis, request the supplied nozzles, cylinder and connection specifications, demonstrated gas use, training and the instructions for your intended service. For facial use, ask for the specific kit and applicable instructions. Compare it with the separate localized systems.

For the XC family, the XC vs XC Plus comparison shows the published features. Choose the nitrogen supply arrangement separately; the model name does not settle which tanks and connections are included.

XC and XC Plus specifications

02
XC and XC Plus specifications
SpecCRYO XCCRYO XC PlusWhat to ask
Current cash packageQuote requiredQuote requiredMatch gas system, configuration, destination and included services; older catalog cash amounts are historical
Published connection230 V, 50 Hz with stated 60 Hz compatibility; minimum 16 A as stated by the maker230 V, 50 Hz with stated 60 Hz compatibility; minimum 16 A as stated by the makerAsk for phase and the exact US connection sheet
Listed dimensions, original order2200 x 950 x 1500 mm2200 x 950 x 1500 mmThe three axes are not identified here; confirm length, width, height and the full working clearance
Published weights370 kg / 700 lb, conflicting370 kg / 700 lb, conflictingObtain equipment and packed masses before delivery and floor review
Maximum power4000 W4000 WAsk for measured kWh over your operating schedule

The October 2026 catalog cash prices are historical. On November 6, 2026, the US catalog advertised monthly payments and quote requests instead. Connection specifications, dimensions and weights from the XC page and XC Plus page were checked October 11, 2026. Do not treat the matching dimensions and electrical rows as proof that all options, features or operating requirements are identical.

03

Choose the nitrogen system before budgeting gas

The XC family has different supply arrangements. Have the supplier identify the offered pressure system, compatible vessel, connectors, delivery method and consumption definition. The XC Plus page lists 5-8 L for its pressurized arrangement and 4-7 L for its non-pressurized arrangement. Ask what cycle and starting conditions those figures describe before using them in a budget.

The current XC consumption figure has an unexplained leading minus sign, so it cannot be used as a reliable operating input. An older brochure may describe a different configuration. Ask for a current consumption schedule covering pre-cooling, completed exposures, idle losses and other resource-consuming cycles.

Before ordering equipment, obtain a compatible local gas-supply proposal with delivered liquid volume, minimum purchase, vessel charges, deliveries and site access. The nitrogen-cost worksheet lets you enter that proposal without borrowing another model's consumption.

The international XC systems comparison, checked October 14, 2026, describes different vessel inclusions. Use that vessel list to check the US quote; an older catalog price does not establish that the same gas package is included.

Choose the nitrogen system before budgeting gas
Offered gas arrangementInternational publicationCurrent US offer still needed
Pressurized XC-family systemPressurized tanks are not included in the international systems publicationIncluded or separately contracted vessel, owner, compatible connection and local supply terms
Non-pressurized XC-family system2 dewar vessels described as includedExact vessel identity, destination inclusion, ownership and compatible supply arrangement

The LC is a separate localized device; ask for its own package list. Ask the equipment supplier and gas supplier to confirm compatibility in their applicable documents. Use the local nitrogen quote sheet for delivered gas, vessel charges and exclusions; do not add an already included vessel again as a separate equipment purchase.

Delivery and room documents to reconcile

04

The two weight labels are not a unit conversion: 370 kg is approximately 815.7 lb. Neither product page explains whether either figure is a packed or equipment mass. Your carrier and site reviewers need the confirmed masses and the drawing for the delivered revision.

There is also a non-equivalent floor-area pair in the physical-specification material. The installation guide shows the published figures beside their unit conversions. Resolve the drawing, service clearance, gas-vessel location and delivery route together. A diagram on a marketing page is not a site approval.

05

Separate parts warranty from on-site service

The US warranty page, checked October 14, describes the XC-family parts limit as 2 years or 7000 sessions, whichever arrives first. Its on-site service wording also has time and usage limits, but coverage is stated to depend on the product and territory. In the description text of the parts rows, the XC and XC Plus names appear mixed up, so ask for the agreement for the exact offered model.

The parts text uses delivery as its starting point; the service text refers to the original retail purchase. The XC Plus new-version comparison also lists longer warranty options as available. Have the quote name any optional warranty you are buying; an empty icon cell gives no coverage terms.

Ask for covered parts, labor, travel and freight, the start date, usage counter, maintenance obligations and exclusions. Confirm whether training, demonstrations or other unpaid cycles count toward the limit. For a used system, request written transfer confirmation rather than assuming a fresh warranty. Use the maintenance and service guide to record charges after coverage ends.

Training and service territory

06

CRYONiQ's operator-training page describes trained operators, certification and signed operation, installation and warranty documents; checked October 11, 2026. Training arrangements vary by territory and offer. Ask which operator and supervision requirements apply to your system before relying on older advertising about hands-off use.

The US catalog gives a CRYONiQ Inc. contact in Wilmington, Delaware. A listed US contact does not identify the closest field technician or guarantee a visit to your site. Have the seller name the service provider, response channel, response obligation, stocked parts and travel basis for your location. Confirm how new staff are trained and which operating revision applies after an update.

07

Questions for the written proposal

Open your checklist notes

Leave unknown answers blank. Your notes are not sent to us or saved automatically. Download them before leaving, and do not enter sensitive information.

Copy and download need JavaScript. You can still write in these fields and select their text to copy manually. The written guidance on this page remains available without the tool.

08

A workable shortlist decision

Keep the XC family on the research list when the supply arrangement works locally, the room drawing and delivery requirements agree, and the proposal gives a clear installation and service scope. Pause a purchase while those remain open. Compare itemized cash quotes for complete configurations; older catalog prices cannot settle the current purchase decision.

Compare a nitrogen proposal with an electric proposal over the same workload and operating period, including gas losses, minimum orders, electricity, staffing and service. Leave missing costs marked unknown until you have the quote.

Sources