cryo:one+ and cryoair flex at a glance
| Spec | cryo:one+ | cryoair flex | What to ask |
|---|---|---|---|
| Cooling | Electric refrigeration, supplier statement | Electric refrigeration, supplier statement | Offered revision and complete component list |
| Published capacity | 2 people per exposure | 2 people per exposure | Actual operating workflow and usable daily throughput |
| Three-phase variant | 380-400 V, 50 Hz | 380-400 V, 50 Hz | Exact variant on the order and contractor-reviewed connection document |
| Alternate three-phase variant | 460 V, 60 Hz; the model FAQ explicitly identifies a US version | 460 V, 60 Hz in the US model document | Delivered voltage and any transformer or additional equipment |
| Connected load | 32 A connected load | 32 A connected load | Circuit requirements and separately metered energy |
| Equipment and installed prices | Quote only | Quote only | Itemized cash proposal for the same destination and scope |
These specifications were checked on October 11, 2026 against the cryo:one+ page and cryoair flex page. Ask for separate specifications for any other MECOTEC model. Two-person capacity still needs appointment time, staffing and demand to produce paid bookings.
Power supply and cooling specifications
The connection figure is labeled connected load. Ask for minimum circuit ampacity and the installation sheet; connected load alone is not enough to size a circuit or calculate daily kWh. Request the electrical schedule for the offered voltage and frequency, and have a qualified local contractor review it against the site's available service. The US comparison lists only one electrical variant; that does not cancel the model page's separate 460 V / 60 Hz option. Use the electrical sheet for the actual offered version.
For cryo:one+, the model page labels real room air down to -121 F (approximately -85 C). Windchill is a separate claim, and MECOTEC's pages disagree: the US model page gives -187.6 F, while the US chamber comparison gives -202 F for cryo:one+. We checked that discrepancy on October 15, 2026. Neither windchill value is an actual room-air reading or a measurement we made. The Celsius conversion is calculated. Ask for one dated specification for the offered revision, with the windchill definition, measurement position, occupancy and operating conditions. The published pages do not explain the difference.
Build the complete room plan
Concept sketch, not to scale or a site layout.
The US model page shows an engine cabinet placed right, left or behind the chamber. As checked October 15, the cabinet illustrations have no dimensions and the chamber comparison has no dimension row. Ask for dimensions before committing to a room. Ask for a dimensioned combined layout showing the chamber, engine cabinet, service access, door movement and every required connection. A chamber footprint alone cannot settle delivery access or the space needed by its supporting equipment.
Before local work is priced, put the model revision, packed dimensions and weights, connection points, heat rejection, delivery route and commissioning responsibilities on one drawing set. Check whether the quoted cabinet position matches the layout that your landlord and contractors are reviewing. Use the installation checklist to assign the remaining questions.
Compare the cost of opening the room
MECOTEC's US chamber-cost article, checked October 11, 2026, says its published market ranges describe other listed models and that MECOTEC prices each project individually. Ask MECOTEC to quote cryo:one+ or cryoair flex for your site; the other brands' ranges do not price either model.
Request separate lines for equipment, delivery and placement, building work, electrical or mechanical work, commissioning, training, service and any software or monitoring subscription. Record whether a line is included, separately priced, excluded or still unknown. A missing service cost stays missing in the quote comparison.
For running costs, obtain measured energy over the hours and workload you expect to use, including pre-cooling and idle time. Pair it with your utility tariff and a current maintenance proposal. Keep the supplier's daily-capacity claim outside the revenue forecast until it has been checked against your workflow and demand.
US support and warranty questions
The global-presence page, checked October 11, lists MECOTEC US, Inc. in New Braunfels, Texas, with sales, service and regional stock functions. That gives a contact to start with. Your agreement still needs a named technician or service entity for your location, response terms, parts origin and travel charges.
The support page describes installation, training, remote monitoring and an available service contract. The cost article mentions warranty periods of up to five years depending on the model and contract. We have no signed terms establishing that duration for either reviewed system.
Ask which parts, labor, travel, refrigerant and scheduled maintenance are covered; when coverage starts; what has to be serviced; and what happens after expiry. For remote monitoring, confirm the required connection, access permissions, software costs and procedure during an internet outage. Put response obligations in writing alongside the warranty duration. The service-cost guide helps you budget the gaps.
Questions for the written proposal
- Which cryo:one+ or cryoair flex revision, voltage, phase and frequency are being offered?
- Which combined layout and current installation documents apply to that configuration?
- Who prices and performs delivery, rigging, building work, commissioning and training?
- What is the complete cash price, including destination-specific exclusions and taxes?
- Which service entity covers this ZIP code, and what response and travel terms apply?
- Which warranty declaration is attached, and how do parts and on-site coverage differ?
- What energy measurement covers a comparable occupied operating day rather than only a nominal connection rating?
- Which costs or access requirements depend on software, monitoring or a recurring contract?
Prepare a supplier request for MECOTEC cryo:one+
Choose the configuration you want to ask about and add your requirements. Download your requirements and questions as a text file. Review it before sending it directly to a supplier; nothing is submitted here.
Questions included in this model request
- Identify the offered cryo:one+ revision and destination-specific voltage, phase and frequency. Keep its documents separate from cryoair flex and other models.
- Reconcile the different windchill claims on the cryo:one+ model and chamber-comparison pages. Supply one dated specification for the offered revision, defining actual room air and windchill separately, with measurement position, occupancy and operating conditions.
- Provide one delivered layout covering every installed module, service clearance, connection point and heat rejection. Confirm packed and equipment dimensions, masses and the delivery route.
- Quote the complete cash package with freight, rigging, building work, commissioning, training, taxes and exclusions itemized. General chamber-market ranges are not this model quotation.
- Provide measured energy over a stated operating period, workload and system boundary. Keep the connected-load label separate from actual kWh and keep occupied cycles separate from paid bookings.
- Name the service entity for the installation ZIP code. Attach current parts, labor, travel, response, software and remote-access terms, including scheduled care and obligations after warranty.
When to keep or pause the shortlist
Keep researching when the supplier identifies a destination-compatible configuration, your site reviewers can assess the full layout, and the proposal gives a usable cost and support scope. Wait for those answers before committing to the purchase. A US contact and an attractive specification cannot replace a feasible building plan or a service obligation.
If the available power, installation work or service arrangement changes the project economics, revisit the electric versus nitrogen comparison using the same documented workload and cost boundary for both options.